on C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head Bridges.
Sub. Head Major No.46.
DESCRIPTION Quantity Unit Rate Cts. $ C Work Twe 201 Spans d. at Chain 105;1. Drawing C.R.E. No.12531. Excavation in founds. Timbering and Pumping. 6650 10/- 300 00 Concrete in founds. 30000 2500 750 00 Masonry in Footings. 230750 35/- % VINORS” 3000 10000 Suprestructure. Coping and Red stones. 140/- % 1200 00 4000 40/- 1800 Dry Stone Pitching. behind abuts. 380 2/ 10/- 00 10/- 180 00 3 50 2 201 Girder Spans landed in Kowloon 500/- each 1000 00 2 100 * Carriage to site and erection. 100/- 200 00 Total 9841 00 Contingencies 10% 984 10 Grand Total $10825 10Page 90
Page 91
58
.VewlisЯr notna noolwo
00
QID
''
I
ACI
AI
0.
.00
0
OC
Or
CI
ИOIT992 MEITISKI
3TAM T22
A
*→
I
on C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
88
* Ling
I A
beall nicN
best duż
Main Head Bridges.
Sub. Head Major No.46.
$
5:0
Work Twe 201 Spans d. at Chain 105;1. Drawing C.R.E. No.12531.
AMOUNT,
Quantity,
DESCRIPTION.
Rate. Unit.
Cts,
C
30000
Item
6650
Excavation in founds.
Timbering and Pumping.
10-
300
00.
250 00.
Coacrete in founds.
35/
%
230750
•
VINORS”
3000
10000
Masonry in Footings.
"
190
Suprestructure.
Coping and Red stones.
140/-%
40/-
1200 00.
4000
00.
1800
Dry Stone Pitching.
D
350
behind abuts.
2/
10/-
10/-
380
00.
ર કરે
180
00.
3
50.
2
201 Girder Spans landed in Kowloon
500/- each 1000
00.
100
2
*
Carriage to site and erection.
100/-
200 ̊00.
#
10
9841
00.
IRJOT
Total
Hastnignino3
Contingincies 10%
984
10.
IsoT bas)
Grand Total
$10825 10.